- Goal
- No carry-over to the next batch
- Clean with
- DegreasePro · Chlorfoam · Teepol HD
- Verify
- Visual check plus test
- Reference
- Codex CXC 80-2020
Why changeovers fail
Most carry-over comes from places that are hard to see: under conveyor belts, inside hoppers, in seals and in the dust on overhead structures. Codex asks food businesses to manage allergens with validated cleaning, scheduling and verification [1].
| Step | What to do | INNOVA product |
|---|---|---|
| 1. Dry clean | Remove loose product, crumbs and powder by scraping and vacuuming | Colour-Coded Cleaning Tools |
| 2. Wash or foam | Apply detergent or foam to break down fat, starch and protein | INNOVA DegreasePro, INNOVA Chlorfoam or INNOVA Teepol HD |
| 3. Scrub | Scrub seals, corners and hard-to-reach parts | Colour-Coded Cleaning Tools |
| 4. Rinse | Rinse with low-pressure water | Water |
| 5. Verify | Visual inspection; allergen or protein test where available | None |
| 6. Sanitise | Sanitise food contact surfaces | INNOVA QuatShield or INNOVA PAA 15 |
Good practice
- Schedule allergen-containing products last, then do the full clean.
- Use dedicated, colour-coded tools for allergen areas.
- Avoid high-pressure water that spreads residue onto clean areas.
- Record each changeover clean and its verification result.
Download: Allergen changeover cleaning checklist (PDF) InnovaChem checklist IC-CL-08. Free, no email needed.
Products and machines used
Quick answers
How do you clean for an allergen changeover?
Dry-clean loose material, wash or foam with a suitable degreaser, scrub hidden parts, rinse, verify visually and with a test where available, then sanitise. Record every changeover clean.
Can a sanitiser remove allergens?
No. Sanitisers kill microbes but do not remove allergen protein. Allergen changeover needs a full clean that physically removes residue, then a check such as a visual inspection or an allergen swab, before the sanitiser.
Who sets the rules for allergen management?
The Codex code of practice on food allergen management (CXC 80-2020) sets the general approach, and FSSAI Schedule 4 expects a documented cleaning programme that covers changeovers.
